Quantcast
Channel: SCN: Message List - SAP SRM: Shopping Cart & Catalog
Viewing all articles
Browse latest Browse all 2860

Replication of SC to PR in Backend System

$
0
0

Hi all,

we are implementing SRM 7.02 with Portal 7.03 and ECC 6.06. We activated PPS (because of integration with Funds Management) and Extended Classic Scenario, becaue it is a prerequisite for PPS. However, the client wants only SC to be created in SRM, and then replicated as PR in ECC. So, practically it's a Classic Scenario.

In Customizing (Cross-Application Basic Settings->Define Objects in Backend System) it's defined that im Backend System for all Prod. Categories ALWAYS PURREQ are generated.

The Jobs for Updating Status are created and they run regularly:

CLEAN_REQREQ_UP

BBP_GET_STATUS_2

Even if these Customizing settings should be enough IMO for creation of PR as follow on documents in Backend System, no follow on documents are created.

So, we activated some BADI's and tried to fix it:

BBP_EXTLOCALPO_BADI -> we deactivated Extended Classic Scenario for all Product Categories

BBP_DETERMINE_LOGSYS -> we determined our Backend System once again, even if it's correctly defined in Customizing under Technical settings

BBP_TARGET_OBJTYPE -> we determined the Object Type and the Backend Logical System in all cases, even if it's defined correctly in Customizing

 

However, the Shopping Carts, both for Direct material as with Account Assignment, are still not replicated in ECC.

In Shopping Cart Monitor in Portal there are no error messages and neither in BBP_PD. The logical System for Backend sytem in the field BE_LOG_SYSTEM is allright now (firstly it showed the SRM system, but now we managed to correct through BADI).

In the Transaction BP_BW_SC2 again the Logical System in Backend System is correct, but no Transmission message and no Follow on document in Backend System. However, the status shown is HELD. On the Portal is the status SAVED. In BBP_PD there are three statuses shown:

HEADER I1009     HELD

HEADER i1021     CREATED

HEADER I1038     COMPLETE

No status is inactive.

I"m rather new in SRM, and I don"t understand why these different statuses. Can someone explain to me if this SC is now Completed, or only HELD until something is completed. There are no messages in SC that something is missing or incomplete.

 

We would appricate any hint and suggestion, why  SC is not replicated as PR to ECC.

Best regards,

AJ

 


Viewing all articles
Browse latest Browse all 2860

Trending Articles



<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>